Construction of a 100 T Furnace at the Glass Factory

Project: Construction of a 100 T Furnace at the Glass Factory
Client: JSC Mina
Period: 2015 - 2016
Location: Ksani Village, Mtskheta District
Area: 32000 m²
Typology: Finished Projects

Installation, testing and commissioning of low-voltage panels, installation works for a 34 KW substation, installation of a 4 MV cable network, installation of fire-protection systems, and structural concrete and steel-construction works.