Construction of a 100 T Furnace at the Glass Factory
Project:
Construction of a 100 T Furnace at the Glass Factory
Client:
JSC Mina
Period:
2015 - 2016
Location:
Ksani Village, Mtskheta District
Area:
32000 m²
Typology:
Finished Projects
Installation, testing and commissioning of low-voltage panels, installation works for a 34 KW substation, installation of a 4 MV cable network, installation of fire-protection systems, and structural concrete and steel-construction works.
